Projects

Central Ark. Library Maintenance Shop

Facebooktwitterpinterestlinkedin instagrammail

Construction on the maintenance facility for the Central Arkansas Library was complete in a total of 8 months. The project features special radius cuts in the rigid frame columns as a decorative feature and special light coves on the low sidewall utilizing 2 different wall panel configurations in a stepped layout. Accessories used included Artisan L12 Soffit Panels, PBU Liner panels and a rooftop equipment screen.

Project Specs



Double-Lok®, ShadowRib™