Projects

Shwayder Camp

Facebooktwitterpinterestlinkedin instagrammail

In need of a recreational center, Shwayder Camp hired Ceco Builders FMP Construction and Big Johnson Construction as general contractor, steel erector and roofing contractor. ZP Architects and Engineers was the architect. At a 10,000 foot elevation, the 4,500+ sq. ft. addition’s building and roof had to meet a significant snow load requirement. The primary framing included a Rigid Frame Clear Span, a tapered beam straight column and 2 lean-to’s. A 5,000 sq. ft. (with overhangs) Double-Lok® standing seam roof system in Hunter Green was utilized to match the existing camp building’s scheme. Due to the temperatures that the camp experiences throughout the year, insulation was very important. Silvercote’s Energy Saver insulation was used on the roof and Batt insulation was used on the walls.

Project Specs



Double-Lok®