| This
The Roof System consists of two paneling options: the Standing Seam Roof
System and the Ribbed Roof System. |
|
 |
MVR |
|
MVR
Roof Panels are roll formed from 80,000 psi yield steel in
26 gauge. Panel coverage is 36 inches with 1 1/8 inch deep
major ribs at 12 inch centers and 2 intermediate minor stiffening
ribs in each flat. Panels may have Galvalume™ or painted
finishes. A UL90 wind uplift rating is available with 6-inch
maximum thickness blanket insulation. Available colors: Standard.
*NOTE: please see side color palette.
|
 |
 |
MAP |
|
| MAP
Roof Panels are roll formed from 50,000 psi minimum yield steel
in 26 gauge. Panel coverage is 36 inches with 1 ½ inch
deep major ribs at 12 inch centers and 2 intermediate minor
stiffening ribs plus 2 pencil ribs in each flat. Panels are
available in GALVALUME® and painted finishes. A UL90 wind
uplift rating is available with 6-inch maximum thickness blanket
insulation. Available colors: Standard and Premium. *NOTE:
please see side color palette. |
 |
 |
| |