R/C Albemarle Movies 8

R/C Albemarle Movies 8

Metal Goes to the Movies   

Back in 2019, Albemarle Theatres LLC began development of the $10 million, 31,820 sq. ft., eight-screen R/C Theatre movie complex (R/C Albemarle Movies 8) in Elizabeth City, North Carolina. The vision? First-run films on 50-foot screens, reclining lounge chairs, laser projection, and a state-of-the-art sound system in a comfortable, family-friendly setting that would accommodate the area’s movie-going public. 

Ceco Building Systems builder Revelle Builders of NC, Inc.—a Murfreesboro, North Carolina-based general contractor that had a longstanding working relationship with the theater chain—became the obvious choice to oversee the construction of the custom-engineered metal-framed structure. The theater would be predominantly clad in an array of insulated metal wall panels and would include a standing seam metal roof system—features that would help the project meet its specific design, performance and energy-efficiency requirements. 

While neither a traditional architect spec job nor a traditional design-build job, Revelle worked with the architectural firm JKRP Partners, LLC, based out of Philadelphia, and the experts at Ceco to develop, design and engineer the complex project. 

Henry Revelle, owner of Revelle Builders, noted that one of the many benefits of bringing Ceco into the mix is its relationship to Metl-Span and Silvercote, which allowed the team to utilize a single source for all its metal framing, panel and insulation needs, helping tremendously with expediting the construction.  

Mark Jones, Vice President of Revelle Builders, shares that although the project didn’t necessarily begin as a design-build, “the architectural firm was willing to work with us as a part of the design team to help facilitate making this project as economical as possible for the owners. In terms of the structural design, we essentially became the designers.”  

He adds, “As a Ceco builder, we were able to take the architect’s detailed floor plan and make it fit with a metal building in the most cost-effective way. The flexibility of Ceco’s design allowed us to accommodate the intricacies of the project.

Project Specs


Project: R/C Albemarle Mobies 8, Elizabeth City, NC

Builder: Revelle Builders of NC, Inc.

Architect: JKRP Partners, LLC

Owner: Albermarle Theaters LLC

Metal panels (wall): PBR, CF Architectural, Light Mesa, Santa Fe®, Striated in Terracotta, Colonial Red, Almond, Zinc Gray, Medium Bronze, and Copper Metallic

Metal panels (roof): Double-Lok® in Galvalume Plus®

Ready to Start?


Find out how Ceco can help build your projects.

Contact Us

Right off the bat, one of the big challenges the Revelle team faced was structurally supporting a multidirectional, second floor mezzanine that served as the projector epicenter. Project manager Harrison Revelle explains, “Due to the orientation of the theater screens and required seating arrangements in relation to the projector mezzanine, we ended up having to literally suspend portions of the equipment platform from the rafters to allow for a clear and accessible area underneath for seating patrons. In spite of this challenging design aspect, Ceco was able to handle this hurdle.”

He adds, “We had certain aesthetic criteria for the building exterior that required special attention to detail as the architect had a particular vision they were trying to achieve, more typically accommodated using stucco or EFIS type façade. Looking into the design further, we noticed an array of colors, textures, profiles, orientations, and depths were required to achieve the required vision. Taking this into consideration with the local energy code requirements needing a specific R-value, we made the suggestion to the architectural firm to use insulated architectural metal wall panels from sister company Metl-Span, meaning the engineering of the full structural frame and envelope could come from one source … all while meeting the appropriate local codes and energy standards. It just made sense to be able to deal solely with Ceco for all variants and aspects of the design as a one-stop-shop.” 

Aside from the custom-engineered metal frame, Ceco provided PBR single skin metal wall panels in Galvalume Plus, which were used on the back of the parapet wall on the roof (which is not visible); insulated metal wall panels in numerous different colors, shapes, and sizes are all visible to the public. The team used the CF Architectural, Light Mesa, Santa Fe, and Striated insulated metal panels in a mix of Terracotta, Colonial Red, Almond, Zinc Grey, Medium Bronze, and Copper Metallic, with a total square footage of wall panel measuring 24,367. 

Mark explains, “It is very unusual to have all those different types and colors, which added to the desired aesthetic appeal.  On three of the walls were a combination of horizontal panels instead of vertical, along with a couple of areas that stepped out on a separate plane to create an architectural band.”  

Harrison adds that the panel choice resulted from a combination of both design and performance considerations. He says, “The R-value for the energy efficiency that we could get from the thickness of the insulated wall panels was one of the factors. From a design perspective, the architects wanted all these different colors, orientations, and depths where the exterior profile had different layers to it, and there would be certain bands of it that would step out and then step back in. That challenge is what led to us using this specific insulated metal panel skin.”  

As for the roof system, the project team chose Double-Lok® in Galvalume Plus along with some conventional roofing. Conventional roofing was used only for the front canopy section because they couldn’t get enough slope—it was basically flat. Mark says, “Ceco was able to provide all the structural elements and decking for us to put that conventional roofing over the top of this small area.” As far as the Double-Lok, “that is the standard for Ceco’s standing seam roofing,” Mark notes, “especially if you have to go with a low pitch, which this was. We needed to go with a quarter and twelve.”  

In terms of roof insulation, instead of a typical liner system, the building utilized the Silvercote R-32 Purlin Glide roof insulation system to improve energy efficiency. 

Although COVID-19 delayed the planned full opening of the theater, which was completed in July 2020, as of May 2021, it is now open for business seven days a week, bringing multiplex movie magic to area residents—young and old. That’s entertainment. 


Download a PDF copy of the Case Study here